good or bad, therefore, in the drying machine in the operation process, must be paid special attention
to the room, air blower and dust cleaning equipment, combustion.
In running a pre drying machine hour light Screw Conveyors the stove, check all appurtenances, each transmission part
comprises a drying machine, a tow parts, should be fastened, normal, smooth, reliable can drive.
(a) light the stove should be checked before furnace, furnace grate, a feeding device, a combustion
chamber, slag, blast inside the door, air duct, regulating valve and the blower, dust collector.
(three) started drying machine is the first step to start the drying machine, after the transport wet
material equipment, and then start the dry Bucket Elevator material transport equipment, forming a continuous and
uniform operation procedures.
Come to check each part of the bearing temperature in the dryer operation process, the temperature
should not exceed 50 ℃, smooth transmission, gear acoustic response, supporting and rotating cylinder
should be no significant impact, vibration and Grain Conveyors driving, you should often do the maintenance and
maintenance equipment inspection,