What procedures belt

1, the stationary Belt Conveyor device means the device should be the rule in a fixed basis. Mobile conveyor before officially running wheels should live with a triangular or wedge brakes stopped . Avoid walking in the attack , more than one conveyor parallel operation, the machine and the machine between the machine and the wall should be between one meter channel.
2, the Screw conveyor shall examine each application before work somewhat , tape hasp and load device is not a normal , protective equipment is not completely . Tape tension must be adjusted before launching into the appropriate level.
3 , belt conveyors should be unloaded start. Such as working properly before feeding . After the first car to stop feeding .
4 , rare sets conveyor tandem operation, should be the beginning of the discharge end , the sequence starts. Full work only after the feeding . 5 , showing the tape operation deviation representation should adjust parking not far-fetched to use , to avoid wear and tear of marginal and add load.
6 , the working environment and sent the material temperature not higher than 50 ℃ and below -10 ℃.
7 , transporting belt stop for pedestrians or by people .
8 , it is necessary to suspend parking before feeding, unloading and other material on the belt to make deposits before parking .
9 , conveyor motors have outstanding insulation is necessary . Mobile conveyor cables do not Luanla and dragging . Motor to solid ground .
10 , prohibit the belt slipping a hand to pull the belt , to avoid seizures trouble.