Debugging Belt Conveyor steps:
⑴ careful testing after installation of the equipment belt conveyor, to meet design requirements.
⑵ The reducer, moving parts corresponding filling oil.
⑶ belt conveyor installation to meet the requirements of a single device for manual work test, and debug belt conveyors combine action to meet the requirements.
⑷ commissioning of the electrical part of the belt conveyor. Including the action of conventional electrical wiring and commissioning, the equipment with good performance, to meet the design features and status.
没有评论:
发表评论